Team-Tan:Status Reports
From Software Engineering
Contents |
[edit] CS498
[edit] Week 8&9
- Working on the lab manual
- Working on the use cases
- Working on the system testing
[edit] Week 6&7
- Met with Dr. G to finalize our feature set
- Worked on refactoring
- Worked on bugs
- Discussed semantic changes in documentation with client
[edit] Week 5
- Finished All Use Cases for MS4
- Met with Dr.G and got some feedbacks
- Fix the jail board
- Redo some parts of Gui
- Working on the use case
[edit] Week 4
- Worked on finalizing our use case list
- Refactored a large portion of our design
- Prepared our presentation for MS 4
- General cleanup of old code
[edit] Week 3
- Finish some use cases
- Start doing UML and class description
- Implemented Suggestions in design
[edit] Week 2
- Working on use cases
- Draft use case description finished
[edit] Week 1
- Review Focalpoint's design
- Set up a new meeting time with client
- Re-design and re-code part of codes
[edit] CS497
[edit] Week 16
- MS 3 finished
- Came out some new use cases for MS4
[edit] Week 15
- Discussed about the design of this project
- Redesigned the project
- Some use cases finished
[edit] Week 14
- Came out some new use cases for MS3
- Disscussed about furture use cases for MS4
[edit] Week 13
- Re-designed the GUI frame
- Talked about the use cases for MS3
- Discussed the requirements for MS3
[edit] Week 12
- Got the feedback from the client
- Started to change the GUI frame
- Worked on the use cases for MS3
[edit] Week 11
- Finished all use case in MS2
- Finished the analysis diagram and class description
- Finished the JUnit test
- Finished the draft use-case for MS3
- Started doing the API and document
[edit] Week 10
- Some use cases finished(Chat room, AI roll dice)
- Some unit test finished
- Revise the use case
[edit] Week 9
- 4 new use cases came out
- Some use cases have partly done. (Join the game, Create new game)
- Start to do API
[edit] Week 8
- Recieved feedback from Dr.Luer.
- Team-Tan need 2~3 BRAND NEW use case
- Finished Setting up Account for SourceForge. Got the New GUI from Jon.
- Some team members are working on the new use cases, others are working on use case implementation
[edit] Week 7
- Finish MS one
- Talk to Su, Decide to rewrite GUI code
- Study Dr.G's Code
- CVS
- peer to peer review, max 17 points for each people
- Assign coding people
[edit] Week 6
We talk with client about:
- Project requirement
- How to deal with AI script
- if need to
- the client will load many scripts at one time(may do latter)
- the discuss the design of gui
- how to integrate event listener with gui.
- discuss how to do with other use cases
- We talked to Dr.G .... Get Some Source Code
[edit] Week 5
Josh, Tan, and Jerry started creating a simple GUI for the project which looks pretty good and will be a good temporary interface while we focus on other more important planning and programming issues. Jon worked on the code for Sockets so we can connect to a Monopd server. Ben and Matt are working on the requirements document requirements for Milestone 1.
[edit] Week 4
This week we started our weekly planning meeting by setting up the Team-Tan wiki and the user pages for each team member. We then started studying the workings of monopd and the protocol that will be used in this project (we set up a basic game of two players. One was running the open source client, Atlantik, and the other one was connected via telnet). After this, we discussed basic design ideas and came up with some items to be brought up at the next client meeting.