Milestone 5 (subject to change)
Focus: System Testing
Due date: Thursday, March 6
Oral presentations of max. 20 minutes are due on the same day.
The project must be feature-complete. The updated project report contains:
- 32 use cases for a 4-person team, 40 for 5-person, 48 for 6-person.
- requirements, analysis, design, unit and system test cases
- updates of all previous documents, as needed
- a schedule that covers the rest of the semester
Other requirements:
- system test data: a set of files that can be read in by the program and that can be used for
system testing. The data must be realistic
- a bug tracking system, in which known bugs have been entered
- all non-trivial features must have unit tests
- there must be at least three system test cases for each use case
- all code (including unit test cases) and system test data must be submitted to the
CVS server on cs.bsu.edu
Remember that all models must be consistent.
CS 498 Spring 2008